Burgdorf Culvert Replacement

Burgdorf Culvert Replacement                                                  12/31/18

Project Description and Cost Detail        

Scope Described

To replace the non-confirming overflow culvert and headwall with one elliptical culvert with a natural stream bottom.  Project is important to bring the road into compliance with NH DES stream crossing regulations.                

Cost Detail

$175,000

Future project; not proposed for funding in 2019.  

Figure from estimate of cost by Dubois & King Engineering.