Grison Culvert Replacement 12/31/18
Project Description and Cost Detail
Scope Described
To replace the non-confirming overflow culverts and headwall with one elliptical culvert with a natural stream bottom. Project is important to bring the road into compliance with NH DES stream crossing regulations.
Cost Detail
$250,000
Future project; not proposed for funding in 2019.
Figure from estimate of cost by Dubois & King Engineering.