Paving of the reconstructed portion of Oak Ridge Road (Eidelweiss Drive to #19) is scheduled for Monday, May 23, 2016.
The detour for all thru traffic remains in place; Please continue to use the detour routes throughout the weekend.
The road will be closed on Monday to all traffic while paving is done.
2016 Documents
Tank lining project status information
WATER SYSTEM TANK LINING PROJECT
At the VDOE Annual Meeting of 2015, the voters approved $99,750 for inspection and lining, as appropriate, of the water system tanks. Taking of a loan that would be payable by the water users through the NH Department of Environmental Services State Revolving Loan Fund was the approved source of the revenue.
During 2015 the bid specification for the project was created by VDOE Engineers, Fluet Associates, a Division of Dubois & King. The bid documents were submitted to and approved by the State. The project was put out to contractors for bidding in late 2015, with intent to act on the project spring of 2016.
Only one bid was received for the project. The NH Department of Environmental Services was questioned on process when only one bid is received and notified the Engineers that the sole bid could be reviewed for acceptance. The bidding contractor’s qualifications to perform the work were then reviewed by the Engineer’s and a recommendation for a meeting with the Contractor to discuss qualifications of the Company was made.
This meeting was held on March 28, 2016. The Contractor, though experienced with metal tank work and the tank lining process, did not have experience with drinking water system tanks. Therefore, the Contractor was not aware of the extra precautions needed and testing required for a public water system. Due to the inability to produce any references for public drinking water system experience, the bidder was disqualified.
We are reviewing options for the tanks, especially the primary storage tanks at Reinach. Replacement of the tanks based on age without spending funds to inspect and line, in conjunction with establishment of a reserve fund for water system tanks, is being looked into. Development of a long term funding plan for water system tanks is needed.
WATER MAIN BREAK – OUTAGE
There is a water main break on Oak Ridge Road. Water services are being interrupted from Oak Ridge Road to Rte 113, including St Moritz, Huttwil, Bern, Barden, Sarnen, Lucerne and Altdorf. Water services will be restored as soon as possible. We appreciate your understanding while this emergency repair is made.
Water Service Interruptions May 17 and/or May 19
Water Service Interruptions
The planned repair on Adelboden was not completed as scheduled and has been rescheduled as outlined below:
Interruptions in water service will occur on Tuesday, May 17 and/or Thursday, May 19 to facilitate a repair on Adelboden. Water service interruptions will occur throughout the District.
Water service interruptions will begin no earlier than 9 am
Service will be restored as soon as possible, no later than 5 pm.
Please plan accordingly.
We appreciate your understanding while this necessary work is completed.
Water Outage Oak Ridge Road to Rte 113
Water service is being effected by work on the system from Oak Ridge Road to Route 113 - Bern, Huttwil, Conway Road, Eidelweiss Drive, Barden, Sarnen, Lucerne, Alpenhof are all effected. Service will be restored as soon as possible; no later than 3 pm today. We appreciate your patience and understanding while this necessary work is being done.
Update on Water Main Break
The water main break on Oak Ridge Road has been repaired. All service is being restored.
Should you note discolored water or air in your lines, please run a large unscreened faucet like your outside hose spigot or bathtub for 15 minutes or until the water clears. Should an issue persist, please contact the office at 367-9022.
Water Main Break – Oak Ridge Road
April 20, 9:30 am: There is a water main break at the bottom of Oak Ridge Road. Water outages are occurring on Oak Ridge Road, Huttwil, and parts of Eidelweiss Drive. Water service will be restored as soon as possible, no later than 5 pm this afternoon. We apologize for any inconvenience and appreciate your understanding while this repair is made.
Oak Ridge Road reconstruction underway
[gview file="http://69.89.31.68/~vdoenhor/wp-content/uploads/2016/04/Eidelweiss-Calendar-Oak-Ridge-Construction.pdf"]The reconstruction of Oak Ridge Road is underway. The Contractor's construction schedule is attached for your reference. Road detour is in effect.
2016 Water CCR
[gview file="http://69.89.31.68/~vdoenhor/wp-content/uploads/2016/04/2016-CCR.pdf"] Attached is the 2016 Water Consumer Confidence Report for the Eidelweiss Water System. Please contact the office with any questions.
Oak Ridge Road reconstruction
The reconstruction of the lower portion of Oak Ridge Road, from Eidelweiss Drive to the newer pavement beginning above #19 Oak Ridge, will begin the week of April 4, 2016. Detours around the construction zone will include use of Chocorua View Drive, right on Basil, left on Saint Moritz, right on Como to Huttwil or use of Upper Lakeview, right on Old Town, right on West Bergamo to Middle Shore. Detours will be posted as needed. All construction is anticipated to be completed by the end of May. Persons living within the construction zone will be allowed access to/from their houses. When construction may cause a driveway to be not accessible for any time frame, the owners will be contacted individually to make arrangements.
We appreciate your understanding while this needed road work is completed.
Should you have questions or concerns, please contact the office at 603-367-9022.