Engineering for upgrading Grandval and Burgdorf to Class V standards 12/20/18
Project Description and Cost Detail
Scope Described
Engineering to design needed upgrades to Grandval Way and Burgdorf Drive from Grandval to Konstanz to bring the newly adopted roads to Class V standards. Area currently does not have proper drainage, is too narrow in places and has obstructions in the travel surface.
Cost Detail
$25,000
Figure from estimate of cost by Dubois & King Engineering.