6 – Grandval and Burgdorf Engineering 1/25/19

Engineering for upgrading Grandval and Burgdorf to Class V standards                                 01/25/19

Project Description and Cost Detail        

Scope Described

Engineering to design needed upgrades to Grandval Way and Burgdorf Drive from Grandval to Konstanz to bring the newly adopted roads to Class V standards.  Area currently does not have proper drainage, is only 10-feet wide in places vs the VDOE 18-foot standard and has boulders in the travel surface. 

The DPW crew is not able to design a full road upgrade; engineering is required for protection of the District. 

Cost Detail

$25,000

Figure from estimate of cost by Dubois & King Engineering.