Included in the packet for the 2018 Annual Meeting is:
Tax Impact/Water rate lmpact
Warrant
Water Bond Priorities
Budqet Details
Lodge upgrade photos
Little Loop Estimate
Storm Water Scope of Work
Eidelweiss Drive culvert at Thusis Estimate
Eidelweiss Road Plan 2018/work completed 2017
Muddy Beach Phase 2 Estimate
Actual Cost per gallon of water 2012 - 2017
[gview file="https://vdoe-nh.org/wp-content/uploads/2018/06/2018-Annual-meeting-handout-V2.pdf"]