Engineering for upgrading Grandval and Burgdorf to Class V standards 01/25/19
Project Description and Cost Detail
Scope Described
Engineering to design needed upgrades to Grandval Way and Burgdorf Drive from Grandval to Konstanz to bring the newly adopted roads to Class V standards. Area currently does not have proper drainage, is only 10-feet wide in places vs the VDOE 18-foot standard and has boulders in the travel surface.
The DPW crew is not able to design a full road upgrade; engineering is required for protection of the District.
Cost Detail
$25,000
Figure from estimate of cost by Dubois & King Engineering.