Isolation Valve Cluster 2

Isolation valve cluster placement at Appenvel and Jungfrau      12/20/18

Project Description and Cost Detail        

Scope Described

To place a three-valve isolation cluster at the intersection of Appenvel and Jungfrau to allow for isolation of that area of the District’s water system without interrupting water service to a larger area.  Reduces number of houses impacted during water system repairs or upgrades in that section of the VDOE.    

Cost Detail

$16,948.80 as shown on spreadsheet

Future Project; not proposed for funding in 2019

All figures are from contractor quotation and equipment price from the supplier